Who we are, and what we're building in West Texas
A data center campus that brings its own power, water and carbon answer, and the companies that make it work.
AI data centers are being funded faster than the power to run them can be built. A new connection to the US grid now takes about five years from request to operation, and the makers of large gas turbines are selling delivery slots years out. Developers are left choosing between waiting in a queue and burning gas on site with nowhere to put the carbon. Water and local permits come next, and in more and more places that is where projects stall.
Greenfield Hyperscale Holdings (GHH) is developing a sustainable industrial campus in the West Texas Permian that answers all four on the site itself: power, water, permits and carbon. A data center is the anchor tenant. The campus is built so the same answer can later be offered to other industries.
How the power works
The campus will run on solid oxide fuel cells fed by pipeline natural gas. A fuel cell turns gas into electricity electrochemically instead of burning it, so there is no flame and very little of the nitrogen oxides that come with combustion.
It also changes what comes out of the exhaust. The fuel side of the cell is kept apart from the air, so its exhaust is mostly carbon dioxide and water vapor, not a few percent of CO2 diluted in nitrogen as it is from an engine or a turbine. Condense the water out and what is left is a nearly pure stream of carbon dioxide, ready to compress and store.
We are planning our own US factory to build the units, 500 kilowatts to 1 megawatt each, in a standard 40-foot container. We build on proven fuel cell stacks rather than developing the technology from scratch, which is what lets units ship in months. Containers also mean the power plant grows in step with the data center, one block at a time.
Where the carbon goes
The campus is designed to capture essentially all of the CO2 from its fuel cells and store it permanently, deep underground, in a depleted gas field beside the site. We are developing that storage well now, with experienced CO2 storage advisors and a university energy research center leading the permit work. The carbon goes back into the same ground the gas came from.
The well can take carbon from others too. Every fuel cell produces a stream that is easy to capture, so every fuel cell customer is also a potential storage customer, and so are the gas-fired plants being built across the region.
Water
Fuel cells make water as they run, about 1,500 gallons a day for every megawatt by our estimate. The campus is planned to cool its data halls without drawing on local drinking water, and to use the water its own power plant makes.
The people who run it
A campus this size needs people who live close to it. We are planning homes on site, not a work camp: one-, two- and three-bedroom houses, with meals included and made in part from vegetables and fish grown on the campus. We expect more than 1,500 jobs at above-average wages, with full benefits.
How we work with our neighbors
We are not asking for local tax breaks. We intend to pay local taxes in full, sign no non-disclosure agreements with counties, make our agreements with them public, and publish how much water and power the campus uses. The point is that the people nearby can check what we said against what we did.
The companies behind it
GHH is the parent company. Greenfield Power Systems will build the fuel cell units. Greenfield Industrial Campus will run the power plant, the water, the land and the storage well. The data center is the campus's first and largest tenant. Each company has a market of its own beyond the campus: fuel cells for anyone who needs power without waiting for the grid, and permanent storage for anyone who needs somewhere to put their carbon.
GHH was formed by Greenfield Hyperscale Partners, the founders' company. Our founding team has records in manufacturing, construction, national technology programs and large-event delivery, and our CFO has been CEO of three public energy companies. Our carbon storage work is chaired by a former President and COO of Denbury Resources, who oversaw sixteen oil-field CO2 projects.
Where we are now
The storage well site is being surveyed and documented. Talks with an established European fuel cell stack maker on a joint venture for our US factory are under way, and we are lining up vendor lead times now so the first pilot unit can be built as soon as it is funded.
On this blog we will write about the problems every data center developer is running into, and how we are answering them. Next: what Texas is now asking data centers to prove.
- Lawrence Berkeley National Laboratory, Queued Up: 2024 Edition: the typical project built in 2023 took nearly five years from interconnection request to commercial operation. emp.lbl.gov
- Greenfield Hyperscale Holdings estimate: water from methane oxidation (CH₄ + 2O₂ → CO₂ + 2H₂O) at typical solid oxide fuel cell efficiency, about 1,500 gallons per megawatt per day.